Mobile informer: Aviation. Operatively and well about everything, concerning aircraft
  CITY:
 MAIN   OPERATION TIMETABLE   AIRPORTS   AIRLINES   NEWS 
RUS | ENG 
DEPARTURE
 
ARRIVAL


A first stage of enlarging air terminal at Paveletsky Railway station has been started.

EAST LINE Group, an operator of Domodedovo International Airport, jointly with JSC Russian Railroads and Moscow Railroad have started realization of the project to enlarge the passenger air terminal at Paveletsky Railway Station. The downtown terminal and High-speed railways link Paveletsky station - Domodedovo International Airport are important constituents of the airport's infrustructure.

After the recunstruction, the total air terminal area will be enlarged almost two-folds, up to 3.000 sq.meters.

The project realization will make for substantial increase of the level of services for passengers using the high-speed link.

The amount of check-in counters will increase up to 14 (against today's 8). Passengers will be entitled to a range of new services, including new retail outlets with a drug store, a souvenir shop, a shop for travellers.

The High-Speed railway system was launched on August 3, 2002 backed by the initiative of Gennady Matveyev, at that time the head of Moscow Railroads, and the management of EAST LINE Group. Today, the railway link is considered a major example for other Moscow airports.

Today, EAST LINE Group is implementing the newest technologies providing for an advanced check in 24 hours prior to departure. The check-in is closed 2,5 hours before a flight.

This year, passengers of SN Brussels got an opportunity to check in at the downtown terminal. The airline became the second international carrier after SWISS Airlines to provide check-in for their passengers at Paveletsky station.

The express trains are operational from 7a.m. till 10 p.m., running every hour, during peak hours - every 30 minutes, with 40 minutes travel time.

Using the High-Speed System, EAST LINE Group introduced a new intermodal transportation technology Domodedovo Air Rail Service (DARS). The service provides for an advanced check-in 24 hours prior to departure, 40-minutes journey to Domodedovo International Airport by a comfortable express train using a single boarding pass, thus considerably facilitating travels between regional centres with shorter travel time. The intermodal programmes are used at such destionations as St.-Petersburg, Nizhny Novgorod and Kalinigrad. EAST LINE is planning to extend this programme to other major regional centres of Russia.

The joint project by JSC Russian Railroads and Domodedovo International Airport is much in demand among passengers of the airport, more than 20% of its passengers use the service to get to and from the airport.



A first stage of enlarging air terminal at Paveletsky Railway station has been started.
Photos:

Date modified: 24.12.2004

Sort by:
Page:  <   / 216  >

Sheremetyevo Airport has provided services toВ 18В million passengers since the beginning ofВ the year

Sheremetyevo Airport has provided services toВ 18В million passengers since the beginning ofВ the year  >>>


Sheremetyevo Airport has provided services toВ 18В million passengers since the beginning ofВ the year.

Passenger traffic onВ international airlines inВ January-July reached 10В million 554 thousand passengers, and onВ domestic airlines increased byВ 23,7%, totaling 7В million 325 thousand passengers.  >>>


Sheremetyevo greets top-of-the-line Airbus A350В XWB

Sheremetyevo International Airport greeted the cutting-edge Airbus A350В XWB, which stopped byВ inВ Russia while onВ its world demo tour. The aircraft landed inВ Sheremetyevo onВ its 55th Anniversary, onВ AugustВ 11. The historical flight was welcomed byВ hundreds ofВ photographers, fans and aviation lovers.  >>>


Sheremetyevo met the newest Airbus A350В XWB

Sheremetyevo International Airport met the newest aircraft Airbus A350В XWB, which made ​​a stop inВ Russia asВ part ofВ the global demonstration tour. The aircraft landed atВ Sheremetyevo AugustВ 11, the day ofВ the 55th anniversary ofВ the airport. The historic flight was met byВ hundreds ofВ photographers, fans and aviation enthusiasts.  >>>


Sheremetyevo greets top-of-the-line Airbus A350В XWB

Sheremetyevo International Airport greeted the cutting-edge Airbus A350В XWB, which stopped byВ inВ Russia while onВ its world demo tour. The aircraft landed inВ Sheremetyevo onВ its 55th Anniversary, onВ AugustВ 11. The historical flight was welcomed byВ hundreds ofВ photographers, fans and aviation lovers.  >>>


Sheremetyevo Airport turns 55В celebrating years ofВ development, achievements, traditions!

Sheremetyevo Airport turns 55В celebrating years ofВ development, achievements, traditions!  >>>


AВ new flight Moscow-Wuhan-Guangzhou from Sheremetyevo

Sheremetyevo International Airport and China Southern Airlines, the largest airline inВ China, opened aВ new regular flight onВ the route Moscow — Wuhan — Guangzhou.  >>>


Sheremetyevo will welcome the newest Airbus AВ 350В XWB

AugustВ 11, 2014 Sheremetyevo International Airport will welcome the newest wide-body aircraft ofВ middle dimension Airbus A350В XWB from Doha. Coincidentally, onВ this day 55В years ago AugustВ 11, 1959 Tu-104 airliner taking off from Leningrad, landed atВ Sheremetyevo airport, where airport services was first carried out aВ set ofВ commercial and technical service. This date isВ considered the birthday ofВ the airport.   >>>


Dobrolet opened new routes toВ Kazan and Ekaterinburg

Dobrolet Airlines started toВ sell tickets onВ the routes Moscow-Kazan-Moscow and Moscow-Ekaterinburg-Moscow.  >>>


The Sheremetyevo International Airport has selected aВ partner, AECOM, for implementation ofВ new Terminal BВ and Inter-Terminal Communication projects

OnВ July 8th, 2014, the management ofВ SP “Terminal BВ Sheremetyevo” and SP “Sheremetyevo Inter-Terminal Passage” signed with AECOM two project management agreements for construction ofВ aВ new Terminal BВ ofВ the Northern terminal complex (NTC) and Inter-Terminal Passage (passenger and luggage tunnels between STC and NTC). International company AECOM was selected byВ OJSC ’MASH’ and the investor asВ aВ result ofВ tender procedures. Partnership agreements are valid till 2017 — estimated deadline ofВ projects implementation.   >>>



 
 FEEDBACK